Wednesday, October 17, 2012

Day 72: Frames up, almost there

It's taking shape! Not your conventional chassis design, but powerful.
VOILA! Lower frame of the e-trike vehicle is now complete. Also, the roll cage on the passenger side is done. Next to be completed will be the differential axle position on the rear side together with the suspension. We are going to use semi-elliptic type leaf spring on the rear, same as being used in other common wheeled vehicles. For the front, we're planning to use the common motorcycle-type fork with shocks as part of the steering system.

We'll probably have the front side of the roll cage be done last, since it will require angled curvature on its shape. It's a delicate process, since the circular form will be the basis shape for the front fiber glass and hood of the trike.


In case you're wondering what the width of the trike is, it's approximately 1.5 meters, same as a regular owner-type Jeep. This will provide spacious leg room for passengers while entering or seating inside. Also, I checked on the clearance of the entrance and everything is good, with less constraint to the passengers.

Tuesday, October 16, 2012

I told the preacher I'm in no hurry

Yesterday, I learned how to deal with detachment. I guess it's time to let the seas cover the distance in between. For the lady and for her adventures on the land down under. Thank you. This is my final song for you.

'But if I broke her heart, then won't you tell her I'm sorry?'



Peace.

Thursday, October 11, 2012

GIG! TONIGHT!


COMMAND YOUR STREET gig tonight!

Get a load of indie alternative music tonight as we play with other great bands in AMOS Cafe, Kamias, Quezon City. FREE ENTRANCE YO!

Wednesday, October 10, 2012

Day 65: Start the production!

Finally, the prototyping stage!

About 2 months since the official Day 1 of Project Proton, we enter into fabrication of the e-trike we are designing. Finally, it's taking shape in reality from just the 3D models, system concepts, and electrical diagrams the company is working on (a lot of debating ensued too) for the past days. I can't release the final look of the product yet to the public, since we're still making last updates for its patent.

To cap off, chassis is the first to be created, as it will be the primary basis for the casing and shape of the trike, along with the weight and capacity relations of the whole product. I can say pretty much the frame (shown below) was done in less than two days. Minor errors did occur though they were fixed immediately. Here's a tip: one (especially designers) must always take in mind that precise measurements in working drawings are not always the same when being done in production. There will be an offside more or less to the actual measurements. The best thing to do is to monitor the production and instruct the builder well. Don't be afraid to discuss what you want to come out from the creation process. (But also allow the builder to work on his own. Do not supervise them round-the-clock; they will hate that.)

We're projecting that the whole lower frame will be done by the end of the week, and the rolling cage (the top structure) will be finished by next week. Final chassis then will consist of the wheels, fork, handles, and the axle and brake systems all combined and working well together. Hoping we get on schedule, production of body will start within two weeks. Now that's more exciting to see!

YAY CHASSIS! Apparently, my hands were shaking when I took this photo.

We're estimating that the whole production of this first e-trike will be completed before December. That will be the fastest the production team can handle, and we think it's also fair. We'll see to it that the prototype will roll-out as soon as possible, so we can have more testing done, details revised, and then release it out on the market early next year. This is going to be an interesting last quarter of 2012! Who's getting pumped up? Well, we are.

Til the next update, mates!

Thursday, October 4, 2012

You & the Nite, and every stories in between



It's never too early or late in the evening. The night is your comforting shroud.

Ladies, gentlemen, and people from out of this world: the fourth and last single off LEO37's EP album, FANFARE. I can still remember the release of Firedance, the kind of music enough to jump start the energy in any one who listens to the song. Now we've come to a more mellow type with soothing beats, honestly my favorite song from the EP, You & The Nite. Still present is producer John Poon's perfect rhythms and bass lines that go well with Leo's style, and also features the vocals of Lillian Chan, another talented and creative artist not only in the field of music but also in animation and film as well. If you give notice to every detail of the song: the lyrics, the rap, the drums, the tunes, you'll feel the same excitement I'll get.

Jumping from the street scene in the video of last single Gorgeous, You & The Nite showcases a blend in of reality and the animated 2D world. The story of the video tells of Leo's relationship with the night: the special time of the day when ideas come and an unusual kind of serenity envelopes the mind of any creative thinker. Artists, musicians, writers, adventurers, and a lot of people alike find comfort in the calming background of the velvet skies and the hovering dance of the moon. The song and this video describe that surreal scenario really well.
Related Posts Plugin for WordPress, Blogger...